Page 1 of 1Questions 1–10 of 59
  1. Q1medium

    Climate change impact on Pakistan hydrology may affect

    1. Aonly fixed constant flow forever unchanged
    2. Bonly electrical wire resistance
    3. Conly urban traffic signals
    4. Dglacier melt patterns and seasonal river flows
    💡 Explanation:

    Water availability uncertainty for hydel planning.

  2. Q2hard

    Suki Kinari hydropower is

    1. Asolar farm in Cholistan only
    2. Bcoal mine in Thar only
    3. Crun-of-river project on Kunhar River
    4. Dwind farm in Gharo only
    💡 Explanation:

    KPK hydropower development.

  3. Q3hard

    Karot hydropower project is on

    1. AIndus at Attock only
    2. BJhelum River
    3. CRavi at Lahore
    4. DDasht River Gwadar
    💡 Explanation:

    CPEC era hydel project.

  4. Q4hard

    HVDC transmission may be used for

    1. Along distance bulk power with lower losses than AC in some cases
    2. Bonly household 230 V wiring exclusively
    3. Conly single solar panel interconnection
    4. Donly battery cell level
    💡 Explanation:

    Point-to-point long haul e.g. interconnection projects.

  5. Q5medium

    Captive power plant in factory

    1. Agenerates electricity for own use may export surplus
    2. Bonly sells only to foreign grid always
    3. Conly pumps water without generation
    4. Donly stores coal without combustion
    💡 Explanation:

    Common in textile and cement industry.

  6. Q6medium

    Power factor penalty on industrial bills encourages

    1. Aonly lowering power factor deliberately
    2. Bimproving power factor toward unity with capacitors
    3. Conly using resistive heaters exclusively
    4. Donly disconnecting meters
    💡 Explanation:

    DISCOs charge for reactive demand.

  7. Q7medium

    Dust on PV panels in Punjab reduces output; mitigation includes

    1. Aonly painting panels black
    2. Bonly tilting to vertical north always wrong
    3. Cperiodic cleaning and anti-soiling coatings
    4. Donly disconnecting strings forever
    💡 Explanation:

    Soiling losses significant in dry regions.

  8. Q8medium

    Solar thermal power (CSP) concentrates sunlight to

    1. Aonly create PV electrons without heat engine
    2. Bonly freeze water
    3. Conly compress air without heat
    4. Dheat fluid driving steam turbine
    💡 Explanation:

    CSP with storage possible; limited in Pakistan vs PV.

  9. Q9hard

    CFR in hydropower context may mean

    1. Aonly coal fly ash residue only wrong context
    2. Bonly currency foreign reserve exclusively in finance
    3. Conly compressive force ratio in soils
    4. Dcapacity factor or capability utilization of plant
    💡 Explanation:

    Plant utilization versus rated capacity.

  10. Q10hard

    Unbundling of power sector separates

    1. Aonly merges all into one office always
    2. Bonly eliminates regulators
    3. Cgeneration, transmission and distribution functions
    4. Donly privatizes roads
    💡 Explanation:

    Market structure reform for competition.

  11. Q11hard

    Wheeling charges in power sector refer to

    1. Aonly bicycle rental
    2. Bfees for using transmission network to move power
    3. Conly water wheel irrigation antique only
    4. Donly coal wagon railway
    💡 Explanation:

    Open access transmission economics.

  12. Q12easy

    Rooftop solar in Pakistan urban areas helps

    1. Areduce bills and diversify supply under net metering
    2. Bonly increases peak load always
    3. Conly blocks all grid power
    4. Donly requires nuclear backup exclusively
    💡 Explanation:

    Distributed generation growth in cities.

  13. Q13easy

    Transformer at grid substation

    1. Asteps voltage up or down for transmission and distribution
    2. Bonly measures humidity
    3. Conly filters coal ash
    4. Donly stores water head
    💡 Explanation:

    Essential for AC power systems.

  14. Q14medium

    High voltage transmission in Pakistan uses

    1. Aonly 12 V DC exclusively nationwide
    2. B500 kV and 220 kV lines among others
    3. Conly 110 V single phase long distance
    4. Donly 24 V battery bus
    💡 Explanation:

    Step-up from generation reduces I²R losses.

  15. Q15easy

    Frequency of Pakistan grid is nominally

    1. A60 Hz
    2. B25 Hz
    3. C50 Hz
    4. D400 Hz
    💡 Explanation:

    Standard utility frequency in Pakistan.

  16. Q16medium

    Smart grid features include

    1. Aonly paper ledger billing
    2. Bonly single manual switch
    3. Conly diesel generators without metering
    4. Dsensors, automation and two-way communication on network
    💡 Explanation:

    Improves reliability and renewable integration.

  17. Q17easy

    Energy efficiency improvement in industry reduces

    1. Aonly increases losses deliberately
    2. Bonly grid voltage
    3. Conly water head at dams
    4. Doverall demand and import fuel burden
    💡 Explanation:

    Efficiency is cheapest virtual generation.

  18. Q18medium

    Biogas from agricultural waste produces

    1. Aonly oxygen for medical use primarily
    2. Bonly solid steel
    3. Cmethane-rich fuel for cooking or generation
    4. Donly distilled water exclusively
    💡 Explanation:

    Anaerobic digestion renewable fuel.

  19. Q19easy

    Tidal energy harnesses

    1. Aonly river flow in mountains only
    2. Brise and fall of sea level
    3. Conly coal combustion
    4. Donly nuclear decay in reactor only
    💡 Explanation:

    Coastal sites needed; limited in Pakistan context.

  20. Q20easy

    Geothermal energy is

    1. Aheat extracted from earth interior for power or direct use
    2. Bonly solar reflection from mirrors
    3. Conly moon tidal gravity
    4. Donly chemical battery
    💡 Explanation:

    Limited exploration in Pakistan vs volcanic regions.

  21. Q21hard

    Pumped storage hydropower needs

    1. Aupper and lower reservoirs with reversible pump-turbines
    2. Bonly flat desert without height difference
    3. Conly battery without water
    4. Donly single canal without head
    💡 Explanation:

    Stores energy by lifting water off-peak.

  22. Q22hard

    Sedimentation in Tarbela reservoir reduces

    1. Aonly turbine efficiency electrically always upward
    2. Bactive storage capacity over decades
    3. Conly solar irradiance
    4. Donly wind speed
    💡 Explanation:

    Indus silt management ongoing challenge.

  23. Q23medium

    Environmental impact of large hydel reservoir may include

    1. Azero any effect always
    2. Bonly improves desert salinity always
    3. Cdisplacement and ecosystem change in flooded area
    4. Donly eliminates all floods forever globally
    💡 Explanation:

    Social and environmental assessment needed.

  24. Q24medium

    Thar coal power projects use

    1. Aonly imported LNG exclusively
    2. Bonly Himalayan glacier melt direct
    3. Conly tidal power
    4. Dindigenous lignite coal from Sindh
    💡 Explanation:

    Local fuel base for thermal generation.

  25. Q25medium

    Pakistan renewable energy policy targets increased share of

    1. Aonly more furnace oil exclusively forever
    2. Bzero hydel development
    3. Cwind, solar, hydro and bagasse in generation mix
    4. Donly imported coal exclusively without alternatives
    💡 Explanation:

    AEDB promotes renewables.

  26. Q26medium

    Battery energy storage on grid can provide

    1. Aonly unlimited energy forever without charging
    2. Bpeak shaving, frequency regulation and backup
    3. Conly increases transmission line length
    4. Donly replaces all generation always
    💡 Explanation:

    BESS growing for flexibility.

  27. Q27medium

    MPPT in solar system tracks

    1. Amaximum power point of PV array versus voltage
    2. Bonly minimum power deliberately
    3. Conly fixed voltage ignoring irradiance
    4. Donly wind direction
    💡 Explanation:

    Irradiance and temperature shift optimal V-I.

  28. Q28Past Paper · PPSC/FPSC/NTSeasy

    Solar inverter converts

    1. ADC from PV array to AC for grid or loads
    2. Bonly AC to DC only always primary
    3. Conly mechanical shaft power
    4. Donly chemical to nuclear
    💡 Explanation:

    MPPT maximizes power from panels.

  29. Q29medium

    Micro-hydel schemes in northern Pakistan serve

    1. Aonly metropolitan 500 kV transmission exclusively
    2. Bremote communities with small run-of-river units
    3. Conly offshore desalination exclusively
    4. Donly coal washing plants
    💡 Explanation:

    Decentralized renewable for valleys.

  30. Q30medium

    HRSG in combined cycle is

    1. AHydraulic Ram Steam Gear
    2. BHigh Resistance Signal Ground
    3. CHeat Recovery Steam Generator
    4. DHelical Rotor Static Governor
    💡 Explanation:

    Boiler using GT exhaust to make steam.

  31. Q31Past Paper · PPSC/FPSC/NTSmedium

    Combined cycle power plant pairs

    1. Aonly wind with solar without heat recovery
    2. Bonly diesel generator without exhaust boiler
    3. Conly hydro with coal without integration
    4. Dgas turbine with steam turbine using exhaust heat recovery
    💡 Explanation:

    Higher efficiency than simple cycle gas.

  32. Q32Past Paper · PPSC/FPSC/NTSmedium

    RLNG in Pakistan power context is

    1. Aonly river water fuel
    2. Bonly bagasse only
    3. Conly uranium ore
    4. DRe-gasified Liquefied Natural Gas used in combined cycle plants
    💡 Explanation:

    Imported LNG supports gas-fired power.

  33. Q33easy

    IPP stands for

    1. AInternal Plant Pump
    2. BIntegrated Power Panel
    3. CIndependent Power Producer
    4. DInternational Pipe Protocol
    💡 Explanation:

    Private generation selling to grid/utility.

  34. Q34Past Paper · PPSC/FPSC/NTSmedium

    Circular debt in Pakistan power sector refers to

    1. Aonly foreign exchange reserves
    2. Bchain of unpaid receivables among power sector entities
    3. Conly agricultural water debt
    4. Donly motorway fines
    💡 Explanation:

    Liquidity issue affecting generation payments.

  35. Q35Past Paper · PPSC/FPSC/NTSeasy

    Load shedding occurs when

    1. Ageneration or transmission cannot meet demand so supply is curtailed
    2. Bgrid has excess power always
    3. Conly maintenance without shortage
    4. Donly voltage is exactly 230 V
    💡 Explanation:

    Pakistan historically faced capacity shortages.

  36. Q36medium

    Dispatch order in merit order dispatch typically uses

    1. Alowest marginal cost units first
    2. Bhighest cost first always
    3. Crandom order
    4. Donly oldest plant always
    💡 Explanation:

    Economic dispatch minimizes fuel cost.

  37. Q37hard

    Levelized cost of energy (LCOE) compares

    1. Aonly capital cost ignoring O&M
    2. Btotal lifecycle cost per kWh generated
    3. Conly fuel cost for one day
    4. Donly land rent
    💡 Explanation:

    Economics metric for generation technologies.

  38. Q38Past Paper · PPSC/FPSC/NTSmedium

    Net metering policy in Pakistan allows

    1. Aonly unlimited free grid use without meter
    2. Bonly industrial coal plants exclusively
    3. Cdistributed generators to offset consumption and export surplus
    4. Dno rooftop solar ever
    💡 Explanation:

    NEPRA net metering rules for small DGs.

  39. Q39medium

    Grid interconnection of renewable plant requires

    1. Aonly direct battery without control
    2. Bonly diesel always without sync
    3. Conly mechanical hand crank
    4. Dinverter or synchronous machine meeting grid codes
    💡 Explanation:

    Voltage, frequency and protection compliance.

  40. Q40medium

    KANUPP was Pakistan first nuclear power unit at

    1. AIslamabad
    2. BMultan
    3. CGilgit
    4. DKarachi
    💡 Explanation:

    Canadian supplied CANDU-type originally.

  41. Q41Past Paper · PPSC/FPSC/NTSmedium

    Nuclear power in Pakistan includes plants at

    1. Aonly Tarbela dam
    2. Bonly Quaid solar park only
    3. CKarachi (KANUPP/K-2/K-3) and Chashma (C-1 to C-5 etc.)
    4. Donly wind Gharo only
    💡 Explanation:

    PAEC operates pressurized water reactors.

  42. Q42Past Paper · PPSC/FPSC/NTSmedium

    Bagasse cogeneration in sugar mills uses

    1. Aonly imported LNG exclusively
    2. Bbiomass waste from sugar cane processing as fuel
    3. Conly river water head without boiler
    4. Donly photovoltaic cells
    💡 Explanation:

    Renewable biomass common in Punjab industry.

  43. Q43medium

    Wind turbine rated power is achieved at

    1. Arated wind speed on the power curve
    2. Bzero wind always
    3. Churricane speeds only without cut-out
    4. Donly when disconnected from grid
    💡 Explanation:

    Power curve rises to rated then limits.

  44. Q44medium

    Capacity factor of solar PV in Pakistan is limited by

    1. Anight, cloud cover and dust soiling on panels
    2. Binfinite sun 24 hours
    3. Czero daylight always
    4. Donly grid frequency
    💡 Explanation:

    Typical capacity factor well below 1.

  45. Q45Past Paper · PPSC/FPSC/NTSmedium

    Wind power in Pakistan is concentrated in

    1. Ahigh Himalaya glaciers only
    2. Bcoastal Sindh and Balochistan corridors (Gharo-Jhimpir etc.)
    3. Cdense urban Lahore centres only
    4. Dunderground mines only
    💡 Explanation:

    Wind corridors along southern coast.

  46. Q46Past Paper · PPSC/FPSC/NTSmedium

    Quaid-e-Azam Solar Park (Bahawalpur) is notable for

    1. Aoffshore tidal barrage
    2. Bnuclear fusion research
    3. Clarge-scale solar PV installation in Punjab
    4. Dcoal gasification only
    💡 Explanation:

    One of early utility-scale solar in Pakistan.

  47. Q47Past Paper · PPSC/FPSC/NTSeasy

    Solar photovoltaic cell converts

    1. Aheat to steam without collector
    2. Bwind to mechanical without blades
    3. Curanium fission heat
    4. Dsunlight directly to DC electricity
    💡 Explanation:

    Silicon and thin-film PV modules.

  48. Q48Past Paper · PPSC/FPSC/NTSmedium

    Run-of-river hydropower typically has

    1. Alarge multi-year storage like Tarbela always
    2. Bno river needed
    3. Conly diesel backup without water
    4. Dlimited storage and depends on seasonal river flow
    💡 Explanation:

    Lower environmental footprint than large reservoir.

  49. Q49Past Paper · PPSC/FPSC/NTSeasy

    Hydropower converts

    1. Aonly solar photons directly without turbine
    2. Bonly chemical battery discharge without water
    3. Cpotential energy of water head to electricity via turbine-generator
    4. Donly wind without generator
    💡 Explanation:

    Clean renewable where water resource exists.

  50. Q50Past Paper · PPSC/FPSC/NTSmedium

    Diamer-Bhasha dam purpose includes

    1. Aonly oil refining
    2. Bwater storage, flood control and hydropower on Indus
    3. Conly steel smelting coal only
    4. Donly airport runway
    💡 Explanation:

    Major storage project upstream.

  51. Q51medium

    Dasu hydropower project is planned on

    1. AIndus River in Kohistan
    2. BLyari River Karachi
    3. CHingol River Balochistan only
    4. DSoan River only
    💡 Explanation:

    Large staged hydel on Indus.

  52. Q52medium

    Neelum-Jhelum hydropower diverts water from

    1. ANeelum river to Jhelum via tunnel
    2. BArabian Sea directly
    3. CRavi to Chenab without mountains
    4. DKabul to Swat only
    💡 Explanation:

    Kashmir region hydel project.

  53. Q53Past Paper · PPSC/FPSC/NTSmedium

    Ghazi-Barotha hydropower project is

    1. Acoal-fired steam plant
    2. Brun-of-river power on Indus downstream of Tarbela
    3. Cnuclear PWR reactor
    4. Doffshore wind farm
    💡 Explanation:

    Tunnel returns water to Indus with power house.

  54. Q54Past Paper · PPSC/FPSC/NTSeasy

    Mangla Dam is on river

    1. AIndus
    2. BSutlej
    3. CJhelum
    4. DKabul
    💡 Explanation:

    First major dam built in Pakistan era on Jhelum.

  55. Q55Past Paper · PPSC/FPSC/NTSeasy

    Tarbela Dam is on river

    1. AJhelum
    2. BChenab
    3. CRavi
    4. DIndus
    💡 Explanation:

    Largest dam in Pakistan on Indus in KPK.

  56. Q56Past Paper · PPSC/FPSC/NTSmedium

    NTDC operates

    1. Aonly domestic gas pipelines exclusively
    2. Bonly railway signals
    3. Conly mobile telecom towers
    4. Dnational transmission grid in Pakistan
    💡 Explanation:

    National Transmission and Despatch Company.

  57. Q57Past Paper · PPSC/FPSC/NTSeasy

    NEPRA regulates

    1. Aonly cricket board schedules
    2. Bonly university admissions
    3. Celectric power sector tariffs and licensing in Pakistan
    4. Donly motorway tolls exclusively
    💡 Explanation:

    National Electric Power Regulatory Authority.

  58. Q58Past Paper · PPSC/FPSC/NTSeasy

    WAPDA historically managed

    1. Aonly textile exports exclusively
    2. Bwater and power development including major dams
    3. Conly aviation air traffic
    4. Donly postal services only
    💡 Explanation:

    Water and Power Development Authority key in hydel.

  59. Q59Past Paper · PPSC/FPSC/NTSeasy

    Pakistan total installed power capacity is dominated historically by

    1. Athermal (fossil) followed by hydel and growing renewables
    2. Bonly nuclear exclusively
    3. Conly tidal exclusively
    4. Donly geothermal exclusively
    💡 Explanation:

    Mix includes thermal, hydro, nuclear and renewables.