Page 1 of 1Questions 1–10 of 50
Q1Past Paper · PPSC/FPSC/NTSeasy
Maintenance engineering aims to
Amaximize equipment availability and reliability at optimal cost✓
Bmaximize breakdown frequency✓
Celiminate all inspections✓
Dignore spare parts✓
💡 Explanation:
Balances cost, safety and performance.
Q2Past Paper · PPSC/FPSC/NTSeasy
Breakdown maintenance (corrective) is
Ascheduled before any fault signs✓
Brepair after failure occurs✓
Conly predictive with sensors always✓
Donly redesign✓
💡 Explanation:
Reactive; costly in critical production.
Q3Past Paper · PPSC/FPSC/NTSeasy
Preventive maintenance (PM) is performed
Aonly after catastrophic failure✓
Bon scheduled time or usage intervals✓
Conly when operator guesses✓
Dnever documented✓
💡 Explanation:
Oil change, inspection tours periodic.
Q4Past Paper · PPSC/FPSC/NTSeasy
Predictive maintenance (PdM) uses
Acondition monitoring to predict failure before breakdown✓
Bonly fixed calendar without measurement✓
Conly run-to-failure always✓
Donly painting equipment✓
💡 Explanation:
Vibration, thermography, oil analysis.
Q5medium
Infant mortality failures often due to
Aonly end-of-life wear✓
Bonly random stable period always✓
Conly proper commissioning✓
Dinstallation errors, defects or burn-in needs✓
💡 Explanation:
Burn-in and quality reduce early failures.
Q6hard
Reliability block diagram models
Aonly financial accounting ledger✓
Bonly soil chemistry✓
Conly textile weave pattern✓
Dsystem reliability from component reliabilities✓
💡 Explanation:
Series parallel combinations.
Q7hard
Weibull analysis in reliability uses
Aonly colour matching paint✓
Bonly musical rhythm✓
Cfailure time data to characterize distribution✓
Donly inventory ABC only✓
💡 Explanation:
Shape parameter β indicates failure pattern.
Q8medium
Planning shutdown turnaround maintenance
Acoordinates major inspection and overhaul during planned outage✓
Bonly surprise breakdown always✓
Conly during peak production always✓
Donly without permits✓
💡 Explanation:
Refinery and plant turnarounds scheduled yearly.
Q9medium
Permit-to-work system ensures
Aanyone enters vessel freely✓
Bhazardous maintenance tasks controlled and authorized✓
Cno lockout needed ever✓
Donly verbal OK without record✓
💡 Explanation:
Safety isolation hot work confined space.
Q10easy
Lockout-tagout (LOTO) prevents
Aonly improves motor speed✓
Baccidental energization during maintenance✓
Conly lubricates bearings✓
Donly cleans filters✓
💡 Explanation:
Isolate electrical, hydraulic, pneumatic sources.
Q11medium
Bearing failure modes include
Aspalling, brinelling, fretting and lubrication failure✓
Bonly improved roundness always✓
Conly lower temperature always beneficial unlimited✓
Donly magnetic levitation always✓
💡 Explanation:
Visual and vibration cues diagnose.
Q12easy
Belt drive maintenance includes
Aonly increasing misalignment✓
Bonly removing guards permanently✓
Ctension check and alignment inspection✓
Donly over-tension until snap✓
💡 Explanation:
Slip and wear from poor tension.
Q13easy
Chain drive lubrication and tension prevent
Aonly electrical arcing✓
Bonly water hammer✓
Conly boiler scale✓
Dpremature elongation and sprocket wear✓
💡 Explanation:
Periodic lubrication per manufacturer.
Q14hard
Corrosion under insulation (CUI) is managed by
Aonly ignoring insulation exterior✓
Bonly increasing moisture trapping✓
Conly removing all inspection✓
Dinspection ports, coatings and moisture barriers✓
💡 Explanation:
Hidden corrosion on piping vessels.
Q15medium
NDT during maintenance turnaround may include
Aonly visual from 100 m distance only✓
Bonly weighing crane hook✓
CUT, RT and MPI on critical welds✓
Donly colour survey✓
💡 Explanation:
Verify integrity after service life.
Q16medium
Calibration maintenance of instruments ensures
Ameasurement accuracy for control and safety✓
Bonly cosmetic dial glass clean✓
Conly increasing random error✓
Donly removing labels✓
💡 Explanation:
Pressure gauges, transmitters periodic cal.
Q17medium
Energy audit in maintenance context finds
Aonly cricket energy scores✓
Bwaste in compressed air leaks and inefficient drives✓
Conly social media usage✓
Donly paper clip inventory✓
💡 Explanation:
Leak surveys save compressor power.
Q18easy
Reliability KPI for plant may track
Aonly canteen meal count✓
Bnumber of unplanned shutdowns per year✓
Conly parking slots✓
Donly font size on reports✓
💡 Explanation:
Management tracks uptime targets.
Q19easy
Maintenance budget includes
Alabour, spares, contractors and tools✓
Bonly marketing advertising exclusively✓
Conly raw material purchase for production exclusively without MRO✓
Donly dividends to shareholders exclusively✓
💡 Explanation:
MRO spend significant in industry.
Q20medium
Skills matrix for maintenance team tracks
Aonly shoe sizes✓
Bonly blood groups for medical only unrelated✓
Ccompetencies per trade and equipment type✓
Donly vehicle license plates✓
💡 Explanation:
Training gaps identified.
Q21medium
Autonomous maintenance step in TPM has operators
Aonly external agency exclusively always✓
Bonly discard all tools✓
Conly increase breakdowns✓
Dclean, inspect and lubricate their machines✓
💡 Explanation:
Early fault detection at source.
Q22easy
Five whys in maintenance investigation asks
Aonly one question always sufficient✓
Bonly who to blame without analysis✓
Conly when to sell machine✓
Dsuccessive why to reach root cause✓
💡 Explanation:
Simple iterative causal chain.
Q23medium
Pakistan industrial maintenance in textiles and cement faces challenges of
Aunlimited automatic zero downtime always✓
Bno need for lubrication ever✓
Cskill shortage, spare lead time and energy cost✓
Donly manual typewriters✓
💡 Explanation:
Local industry invests in PM and training.
Q24medium
Predictive maintenance adoption in Pakistan is growing with