Maintenance Engineering MCQs 2026

50 questions with detailed answers · 18 from past papers · 5 quiz batches available

📚 Mechanical Engineering📄 18 Past-Paper Qs✓ Free · No Login Needed
🎯 Mock Test

Read each question, think about the answer, then click Show Answer to reveal the correct option and explanation. Load 10 at a time so it stays manageable — perfect for one-topic study sessions on the bus or during a break.

Page 1 of 1Questions 1–10 of 50
  1. Q1Past Paper · PPSC/FPSC/NTSeasy

    Maintenance engineering aims to

    1. Amaximize equipment availability and reliability at optimal cost
    2. Bmaximize breakdown frequency
    3. Celiminate all inspections
    4. Dignore spare parts
    💡 Explanation:

    Balances cost, safety and performance.

  2. Q2Past Paper · PPSC/FPSC/NTSeasy

    Breakdown maintenance (corrective) is

    1. Ascheduled before any fault signs
    2. Brepair after failure occurs
    3. Conly predictive with sensors always
    4. Donly redesign
    💡 Explanation:

    Reactive; costly in critical production.

  3. Q3Past Paper · PPSC/FPSC/NTSeasy

    Preventive maintenance (PM) is performed

    1. Aonly after catastrophic failure
    2. Bon scheduled time or usage intervals
    3. Conly when operator guesses
    4. Dnever documented
    💡 Explanation:

    Oil change, inspection tours periodic.

  4. Q4Past Paper · PPSC/FPSC/NTSeasy

    Predictive maintenance (PdM) uses

    1. Acondition monitoring to predict failure before breakdown
    2. Bonly fixed calendar without measurement
    3. Conly run-to-failure always
    4. Donly painting equipment
    💡 Explanation:

    Vibration, thermography, oil analysis.

  5. Q5medium

    Infant mortality failures often due to

    1. Aonly end-of-life wear
    2. Bonly random stable period always
    3. Conly proper commissioning
    4. Dinstallation errors, defects or burn-in needs
    💡 Explanation:

    Burn-in and quality reduce early failures.

  6. Q6hard

    Reliability block diagram models

    1. Aonly financial accounting ledger
    2. Bonly soil chemistry
    3. Conly textile weave pattern
    4. Dsystem reliability from component reliabilities
    💡 Explanation:

    Series parallel combinations.

  7. Q7hard

    Weibull analysis in reliability uses

    1. Aonly colour matching paint
    2. Bonly musical rhythm
    3. Cfailure time data to characterize distribution
    4. Donly inventory ABC only
    💡 Explanation:

    Shape parameter β indicates failure pattern.

  8. Q8medium

    Planning shutdown turnaround maintenance

    1. Acoordinates major inspection and overhaul during planned outage
    2. Bonly surprise breakdown always
    3. Conly during peak production always
    4. Donly without permits
    💡 Explanation:

    Refinery and plant turnarounds scheduled yearly.

  9. Q9medium

    Permit-to-work system ensures

    1. Aanyone enters vessel freely
    2. Bhazardous maintenance tasks controlled and authorized
    3. Cno lockout needed ever
    4. Donly verbal OK without record
    💡 Explanation:

    Safety isolation hot work confined space.

  10. Q10easy

    Lockout-tagout (LOTO) prevents

    1. Aonly improves motor speed
    2. Baccidental energization during maintenance
    3. Conly lubricates bearings
    4. Donly cleans filters
    💡 Explanation:

    Isolate electrical, hydraulic, pneumatic sources.

  11. Q11medium

    Bearing failure modes include

    1. Aspalling, brinelling, fretting and lubrication failure
    2. Bonly improved roundness always
    3. Conly lower temperature always beneficial unlimited
    4. Donly magnetic levitation always
    💡 Explanation:

    Visual and vibration cues diagnose.

  12. Q12easy

    Belt drive maintenance includes

    1. Aonly increasing misalignment
    2. Bonly removing guards permanently
    3. Ctension check and alignment inspection
    4. Donly over-tension until snap
    💡 Explanation:

    Slip and wear from poor tension.

  13. Q13easy

    Chain drive lubrication and tension prevent

    1. Aonly electrical arcing
    2. Bonly water hammer
    3. Conly boiler scale
    4. Dpremature elongation and sprocket wear
    💡 Explanation:

    Periodic lubrication per manufacturer.

  14. Q14hard

    Corrosion under insulation (CUI) is managed by

    1. Aonly ignoring insulation exterior
    2. Bonly increasing moisture trapping
    3. Conly removing all inspection
    4. Dinspection ports, coatings and moisture barriers
    💡 Explanation:

    Hidden corrosion on piping vessels.

  15. Q15medium

    NDT during maintenance turnaround may include

    1. Aonly visual from 100 m distance only
    2. Bonly weighing crane hook
    3. CUT, RT and MPI on critical welds
    4. Donly colour survey
    💡 Explanation:

    Verify integrity after service life.

  16. Q16medium

    Calibration maintenance of instruments ensures

    1. Ameasurement accuracy for control and safety
    2. Bonly cosmetic dial glass clean
    3. Conly increasing random error
    4. Donly removing labels
    💡 Explanation:

    Pressure gauges, transmitters periodic cal.

  17. Q17medium

    Energy audit in maintenance context finds

    1. Aonly cricket energy scores
    2. Bwaste in compressed air leaks and inefficient drives
    3. Conly social media usage
    4. Donly paper clip inventory
    💡 Explanation:

    Leak surveys save compressor power.

  18. Q18easy

    Reliability KPI for plant may track

    1. Aonly canteen meal count
    2. Bnumber of unplanned shutdowns per year
    3. Conly parking slots
    4. Donly font size on reports
    💡 Explanation:

    Management tracks uptime targets.

  19. Q19easy

    Maintenance budget includes

    1. Alabour, spares, contractors and tools
    2. Bonly marketing advertising exclusively
    3. Conly raw material purchase for production exclusively without MRO
    4. Donly dividends to shareholders exclusively
    💡 Explanation:

    MRO spend significant in industry.

  20. Q20medium

    Skills matrix for maintenance team tracks

    1. Aonly shoe sizes
    2. Bonly blood groups for medical only unrelated
    3. Ccompetencies per trade and equipment type
    4. Donly vehicle license plates
    💡 Explanation:

    Training gaps identified.

  21. Q21medium

    Autonomous maintenance step in TPM has operators

    1. Aonly external agency exclusively always
    2. Bonly discard all tools
    3. Conly increase breakdowns
    4. Dclean, inspect and lubricate their machines
    💡 Explanation:

    Early fault detection at source.

  22. Q22easy

    Five whys in maintenance investigation asks

    1. Aonly one question always sufficient
    2. Bonly who to blame without analysis
    3. Conly when to sell machine
    4. Dsuccessive why to reach root cause
    💡 Explanation:

    Simple iterative causal chain.

  23. Q23medium

    Pakistan industrial maintenance in textiles and cement faces challenges of

    1. Aunlimited automatic zero downtime always
    2. Bno need for lubrication ever
    3. Cskill shortage, spare lead time and energy cost
    4. Donly manual typewriters
    💡 Explanation:

    Local industry invests in PM and training.

  24. Q24medium

    Predictive maintenance adoption in Pakistan is growing with

    1. Avibration sensors and CMMS in larger plants
    2. Bzero technology use nationwide
    3. Conly paper logs exclusively forever all plants
    4. Donly outsourced foreign operators exclusively always
    💡 Explanation:

    Modern plants use condition monitoring.

  25. Q25easy

    Safety in maintenance work on Pakistani factory floor requires

    1. Ano helmets to save cost always
    2. BPPE, LOTO and compliance with labour safety regulations
    3. Cignore confined space rules
    4. Dhot work without fire watch
    💡 Explanation:

    Factories Act and OSHA-inspired practices.

  26. Q26medium

    Wear-out zone on bathtub failure curve shows

    1. Adecreasing failures always
    2. Bconstant zero failures
    3. Cincreasing failure rate at end of life
    4. Donly infant mortality
    💡 Explanation:

    Aging parts; planned replacement may apply.

  27. Q27medium

    Overhaul versus repair: overhaul is

    1. Acomprehensive restoration to near-new condition
    2. Bonly tightening one bolt
    3. Conly wiping exterior dust
    4. Donly changing label
    💡 Explanation:

    May include machining and new bearings/seals.

  28. Q28medium

    Run-to-failure strategy acceptable for

    1. Anuclear safety valve exclusively
    2. Blow-cost non-critical redundant items
    3. Caircraft engine turbine blades
    4. Dhigh-pressure boiler safety
    💡 Explanation:

    Economic when failure impact is minimal.

  29. Q29Past Paper · PPSC/FPSC/NTSmedium

    Condition-based maintenance triggers work when

    1. Aonly calendar date regardless of condition
    2. Bmonitored parameter exceeds threshold
    3. Conly random choice
    4. Donly machine colour changes
    💡 Explanation:

    Data-driven intervention timing.

  30. Q30hard

    Failure mode effects analysis (FMEA) ranks

    1. Aseverity, occurrence and detection of failure modes
    2. Bonly paint gloss
    3. Conly office carpet colour
    4. Donly canteen menu
    💡 Explanation:

    RPN drives design and maintenance priorities.

  31. Q31Past Paper · PPSC/FPSC/NTSmedium

    Root cause failure analysis (RCFA) in maintenance seeks

    1. Aonly temporary patch without investigation
    2. Bonly blame operator without data
    3. Cunderlying cause of repeated failures
    4. Donly increase spare cost
    💡 Explanation:

    Prevent recurrence with engineering fix.

  32. Q32Past Paper · PPSC/FPSC/NTSeasy

    CMMS stands for

    1. ACentral Motor Monitoring Standard
    2. BCompressed Maintenance Manual Set
    3. CChemical Material Management System
    4. DComputerized Maintenance Management System
    💡 Explanation:

    Software for work orders and asset history.

  33. Q33Past Paper · PPSC/FPSC/NTSmedium

    Work order in CMMS documents

    1. Aonly sales invoice to customer
    2. Bonly university transcript
    3. Conly passport application
    4. Dmaintenance task, labour, parts and completion status
    💡 Explanation:

    Computerized Maintenance Management System.

  34. Q34easy

    Bills of materials for maintenance links

    1. Aonly employee birthdays
    2. Bonly cricket scores
    3. Cparts to equipment assemblies for planning
    4. Donly weather forecast
    💡 Explanation:

    EBOM supports spare parts cataloguing.

  35. Q35medium

    Spare parts inventory ABC in maintenance prioritizes

    1. Acritical infrequent high-value parts differently than consumables
    2. Bonly alphabetical part numbers
    3. Conly paint colours
    4. Donly supplier logos
    💡 Explanation:

    Stock policy by criticality and lead time.

  36. Q36medium

    Balancing rotating parts reduces

    1. Aonly electrical harmonics without rotation
    2. Bvibration forces on bearings and structure
    3. Conly static weight of base
    4. Donly oil viscosity
    💡 Explanation:

    Dynamic balance at operating speed.

  37. Q37Past Paper · PPSC/FPSC/NTSmedium

    Alignment of coupled shafts prevents

    1. Aonly improves paint adhesion
    2. Bvibration, bearing wear and coupling failure
    3. Conly electrical power factor
    4. Donly water hardness
    💡 Explanation:

    Laser alignment within tolerance specs.

  38. Q38Past Paper · PPSC/FPSC/NTSeasy

    Lubrication schedule too infrequent causes

    1. Aaccelerated wear and overheating
    2. Binfinite bearing life
    3. Clower temperature always beneficial
    4. Dzero friction
    💡 Explanation:

    Starved lubrication metal contact.

  39. Q39easy

    Grease versus oil lubrication: grease suits

    1. Aonly high-speed turbine bearings always needing flow
    2. Bonly open gears needing bath always
    3. Csealed-for-life bearings and hard-to-reach points
    4. Donly hydraulic systems
    💡 Explanation:

    Thickener holds oil in place.

  40. Q40Past Paper · PPSC/FPSC/NTSeasy

    Lubrication purpose in machinery is to

    1. Aincrease friction deliberately always
    2. Bonly clean exterior paint
    3. Conly increase electrical resistance
    4. Dreduce friction, wear and heat between surfaces
    💡 Explanation:

    Oil film separates moving parts.

  41. Q41medium

    Ultrasonic testing in maintenance listens for

    1. Aonly visible light colour
    2. Bonly DC voltage only
    3. Conly room temperature only
    4. Dhigh-frequency leaks and bearing defects
    💡 Explanation:

    Compressed air leaks, electrical corona.

  42. Q42Past Paper · PPSC/FPSC/NTSmedium

    Oil analysis (wear debris, viscosity) indicates

    1. Aonly external paint rust only
    2. Bonly operator skill
    3. Cinternal machine wear and contamination
    4. Donly belt colour
    💡 Explanation:

    Spectrometric oil monitoring for engines and gearboxes.

  43. Q43Past Paper · PPSC/FPSC/NTSmedium

    Infrared thermography in PdM finds

    1. Aabnormal hot spots in electrical and mechanical equipment
    2. Bonly internal cracks without surface temperature change always
    3. Conly sound frequency
    4. Donly weight of part
    💡 Explanation:

    Loose connections, overloaded bearings show heat.

  44. Q44Past Paper · PPSC/FPSC/NTSmedium

    Vibration analysis detects

    1. Aonly chemical pH of coolant
    2. Bbearing defects, imbalance and misalignment early
    3. Conly paint colour fading
    4. Donly room humidity office
    💡 Explanation:

    Spectral analysis of vibration signatures.

  45. Q45medium

    OEE in maintenance context reflects

    1. Aonly office attendance
    2. Bequipment losses from availability, performance and quality
    3. Conly fuel import cost
    4. Donly river flow
    💡 Explanation:

    Six big losses targeted by TPM.

  46. Q46Past Paper · PPSC/FPSC/NTSmedium

    TPM (Total Productive Maintenance) involves

    1. Aoperators and maintenance staff improving equipment effectiveness
    2. Bonly external contractors exclusively
    3. Conly top management memos
    4. Donly selling old machines
    💡 Explanation:

    Autonomous maintenance and cross-functional teams.

  47. Q47Past Paper · PPSC/FPSC/NTSmedium

    Availability A = MTBF / (MTBF + MTTR) represents

    1. Aonly quality defect rate
    2. Bonly inventory turns
    3. Cproportion of time equipment is operable
    4. Donly profit margin
    💡 Explanation:

    Uptime fraction for repairable systems.

  48. Q48Past Paper · PPSC/FPSC/NTSmedium

    MTTR (Mean Time To Repair) measures

    1. Atime between failures
    2. Bmachine design life only
    3. Cwarranty period only
    4. Daverage time to restore equipment after failure
    💡 Explanation:

    Maintainability metric; lower MTTR better.

  49. Q49Past Paper · PPSC/FPSC/NTSmedium

    MTBF (Mean Time Between Failures) measures

    1. Aonly repair duration
    2. Bonly calendar year length
    3. Conly operator shift hours payroll
    4. Daverage operating time between failures for repairable items
    💡 Explanation:

    Reliability metric; higher MTBF better.

  50. Q50hard

    Reliability-centered maintenance (RCM) analyzes

    1. Aonly aesthetic painting schedule
    2. Bonly office cleaning
    3. Cfailure modes and consequences to choose maintenance tasks
    4. Donly marketing plan
    💡 Explanation:

    Risk-based task selection per asset.