Industrial engineering primarily focuses on
💡 Explanation:IE improves productivity and efficiency of complex systems.
- Q2Past Paper · PPSC/FPSC/NTSeasy
Method study in industrial engineering is concerned with
💡 Explanation:Method study eliminates wasteful motions and sequences.
- Q3Past Paper · PPSC/FPSC/NTSeasy
Time study is used to determine
💡 Explanation:Time study establishes norms for planning and incentives.
- Q4medium
Therbligs are
💡 Explanation:Gilbreth classified fundamental motions like reach, grasp and transport.
- Q5easy
A flow process chart records
💡 Explanation:Flow charts visualize material and information flow.
- Q6medium
String diagram is used in plant layout to show
💡 Explanation:String diagrams quantify travel distance for layout improvement.
- Q7medium
Travel chart in layout study plots
💡 Explanation:From-to charts guide rearrangement to reduce handling.
- Q8Past Paper · PPSC/FPSC/NTSeasy
Line balancing aims to
💡 Explanation:Balancing minimizes idle time and maximizes line output.
- Q9Past Paper · PPSC/FPSC/NTSmedium
Cycle time on an assembly line is determined by
💡 Explanation:Line output rate equals bottleneck station rate.
- Q10medium
Number of workstations for a given cycle time equals
💡 Explanation:Required stations = ⌈Σ task times / cycle time⌉.
- Q11Past Paper · PPSC/FPSC/NTSeasy
Economic Order Quantity (EOQ) minimizes
💡 Explanation:EOQ balances setup cost against inventory carrying cost.
- Q12medium
In EOQ model, annual holding cost increases with
💡 Explanation:Larger batches raise average inventory and holding cost.
- Q13Past Paper · PPSC/FPSC/NTSmedium
Reorder point depends on
💡 Explanation:ROP = demand rate × lead time + safety stock.
- Q14easy
ABC analysis classifies inventory by
💡 Explanation:A items are few but high value; C items are many low value.
- Q15Past Paper · PPSC/FPSC/NTSeasy
PERT is used mainly for
💡 Explanation:Program Evaluation and Review Technique handles probabilistic durations.
- Q16Past Paper · PPSC/FPSC/NTSeasy
CPM assumes activity durations are
💡 Explanation:Critical Path Method uses fixed times for network analysis.
- Q17Past Paper · PPSC/FPSC/NTSmedium
Critical path in a project network is
💡 Explanation:Delay on critical path delays entire project.
- Q18medium
Float (slack) of a non-critical activity is
💡 Explanation:Slack = LS − ES = LF − EF.
- Q19medium
Dummy activity in CPM network represents
💡 Explanation:Dummies preserve precedence relationships.
- Q20hard
Crashing a project means
💡 Explanation:Crash cost trade-off seeks minimum cost for target duration.
- Q21Past Paper · PPSC/FPSC/NTSeasy
Linear programming seeks to
💡 Explanation:LP maximizes or minimizes Z = c₁x₁ + c₂x₂ + … under restrictions.
- Q22medium
Feasible region in LP is
💡 Explanation:Corner point theorem: optimum occurs at feasible corner.
- Q23hard
Simplex method solves LP by
💡 Explanation:Simplex iterates on basic feasible solutions.
- Q24Past Paper · PPSC/FPSC/NTSmedium
In a single-server queuing system, arrival rate λ and service rate μ must satisfy for stability
💡 Explanation:Traffic intensity ρ = λ/μ must be less than 1.
- Q25medium
Average waiting time in queues generally increases when
💡 Explanation:Heavy traffic causes long waits nonlinearly.
- Q26hard
Little's Law states L =
💡 Explanation:Fundamental queuing relation L = λW.
- Q27medium
Work sampling is used to
💡 Explanation:Statistical sampling determines activity percentages.
- Q28easy
Allowance in time study accounts for
💡 Explanation:Normal time is increased by allowance percentage.
- Q29medium
Performance rating in time study compares
💡 Explanation:Analyst rates speed and effort versus defined normal.
- Q30Past Paper · PPSC/FPSC/NTSmedium
Standard time equals
💡 Explanation:ST = NT(1 + A) includes justified delays.
- Q31Past Paper · PPSC/FPSC/NTSeasy
Value engineering aims to
💡 Explanation:VE analyzes function versus cost systematically.
- Q32easy
Forecasting methods include
💡 Explanation:Quantitative forecasting uses historical demand patterns.
- Q33medium
Exponential smoothing gives more weight to
💡 Explanation:Smoothing constant α controls recency emphasis.
- Q34Past Paper · PPSC/FPSC/NTSmedium
Master production schedule drives
💡 Explanation:MPS states what to build and when at finished-item level.
- Q35easy
Bill of materials (BOM) lists
💡 Explanation:BOM structures material requirements for MRP.
- Q36medium
MRP logic explodes BOM based on
💡 Explanation:Material Requirements Planning nets demand against stock.
- Q37Past Paper · PPSC/FPSC/NTSeasy
Kanban is associated with
💡 Explanation:Cards signal replenishment in JIT systems.
- Q38Past Paper · PPSC/FPSC/NTSeasy
Just-in-Time (JIT) seeks to
💡 Explanation:JIT reduces waste and lead time.
- Q39medium
5S workplace organization includes Seiri, Seiton, Seiso, Seiketsu and
💡 Explanation:Fifth S sustains the other four practices.
- Q40easy
Bottleneck resource in production limits
💡 Explanation:Theory of Constraints focuses on system constraint.
- Q41medium
Theory of Constraints five focusing steps begin with
💡 Explanation:First find what limits throughput.
- Q42easy
Product layout is best for
💡 Explanation:Assembly lines use product-oriented arrangement.
- Q43easy
Process layout groups
💡 Explanation:Job-shop layout handles varied routes and low volume.
- Q44medium
Fixed-position layout is used for
💡 Explanation:Product stays put; resources come to it.
- Q45Past Paper · PPSC/FPSC/NTSeasy
Ergonomics in IE addresses
💡 Explanation:Human factors design improves safety and performance.
- Q46medium
Learning curve effect means
💡 Explanation:Experience curve reflects improving proficiency.
- Q47Past Paper · PPSC/FPSC/NTSeasy
Break-even analysis finds quantity where
💡 Explanation:BEP: F + vQ = pQ.
- Q48easy
Fixed cost in break-even context
💡 Explanation:Rent and salaries often treated as fixed.
- Q49Past Paper · PPSC/FPSC/NTSeasy
Productivity ratio can be expressed as
💡 Explanation:Productivity measures efficiency of resource use.
- Q50Past Paper · PPSC/FPSC/NTSmedium
Overall Equipment Effectiveness (OEE) combines
💡 Explanation:OEE = A × P × Q for equipment utilization.
- Q51easy
Depreciation in engineering economy represents
💡 Explanation:Accounting charge for asset consumption.
- Q52Past Paper · PPSC/FPSC/NTSmedium
Present worth analysis discounts
💡 Explanation:Time value of money guides investment decisions.
- Q53hard
Internal rate of return (IRR) is the discount rate that makes
💡 Explanation:IRR compares project yield to hurdle rate.
- Q54easy
Payback period measures
💡 Explanation:Simple metric ignoring time value after payback.
- Q55Past Paper · PPSC/FPSC/NTSmedium
Sunk cost should generally be
💡 Explanation:Irrecoverable past costs are irrelevant to forward choices.
- Q56medium
Opportunity cost in IE decisions is
💡 Explanation:True economic cost includes alternatives sacrificed.
- Q57hard
Monte Carlo simulation in OR uses
💡 Explanation:Repeated trials estimate risk in project outcomes.
- Q58medium
Transportation model in LP minimizes
💡 Explanation:Balanced transport table optimizes distribution.
- Q59hard
Assignment problem is special case where
💡 Explanation:Hungarian method solves personnel-machine matching.
- Q60medium
Simulation differs from optimization because it
💡 Explanation:Simulation models complex stochastic systems.
- Q61easy
Gantt chart displays
💡 Explanation:Visual schedule for progress monitoring.
- Q62easy
Milestone on a project chart marks
💡 Explanation:Key checkpoints without duration themselves.
- Q63medium
Cellular manufacturing groups
💡 Explanation:Group technology reduces material travel.
- Q64Past Paper · PPSC/FPSC/NTSmedium
Takt time is calculated as
💡 Explanation:Takt sets pace to match market pull.
- Q65medium
Andon system provides
💡 Explanation:Lights/boards alert teams to stop and fix problems.
- Q66Past Paper · PPSC/FPSC/NTSmedium
Poka-yoke means
💡 Explanation:Error-proof devices prevent wrong assembly.
- Q67medium
Six Sigma targets defect rate near
💡 Explanation:DMAIC reduces process variation statistically.
- Q68easy
DMAIC stands for Define, Measure, Analyze, Improve and
💡 Explanation:Control phase sustains gains with monitoring.
- Q69easy
Lean manufacturing primarily eliminates
💡 Explanation:Lean focuses on value-adding activities only.
- Q70medium
SMED aims to reduce
💡 Explanation:Single-minute exchange of die enables small batches.