Pakistan Building Codes and Construction Practices MCQs 2026

60 questions with detailed answers · 26 from past papers · 6 quiz batches available

📚 Civil Engineering📄 26 Past-Paper Qs✓ Free · No Login Needed
🎯 Mock Test

Read each question, think about the answer, then click Show Answer to reveal the correct option and explanation. Load 10 at a time so it stays manageable — perfect for one-topic study sessions on the bus or during a break.

Page 1 of 1Questions 1–10 of 60
  1. Q1medium

    Party wall agreement needed when

    1. ABuilding in desert alone always
    2. BOnly federal highway
    3. COnly airport runway
    4. DBuilding on shared boundary with neighbour
    💡 Explanation:

    Legal clearance for footing projection on boundary

  2. Q2easy

    Minimum ceiling height residential often about

    1. A2.4 to 2.7 m clear per bylaws
    2. B0.5 m
    3. C10 m mandatory all rooms
    4. DNo minimum ever
    💡 Explanation:

    Ventilation and habitability standards

  3. Q3medium

    Lightning protection for tall buildings uses

    1. AOnly plastic rods
    2. BOnly paint coating
    3. CAir terminals and down conductors to earth
    4. DOnly glass facade only
    💡 Explanation:

    Protection system per applicable standard where required

  4. Q4medium

    Rainwater downpipe sizing based on

    1. AOnly wind speed
    2. BRoof area and rainfall intensity
    3. COnly seismic zone
    4. DOnly FAR only
    💡 Explanation:

    Plumbing code links drainage to local design storm

  5. Q5Past Paper · PPSC/FPSC/NTSmedium

    Parking requirement in commercial zoning based on

    1. AFloor area or seats per bylaw
    2. BOnly owner car count wish
    3. CZero parking always mandated
    4. DOnly bicycle always without cars ever
    💡 Explanation:

    CDA LDA require minimum off-street parking

  6. Q6easy

    Building line on street defined in master plan as

    1. AInterior paint boundary
    2. BLimit beyond which structure cannot project
    3. CKitchen location
    4. DElevator brand line
    💡 Explanation:

    Setback plus building line control streetscape

  7. Q7Past Paper · PPSC/FPSC/NTSmedium

    Strengthening existing building for extra floor requires

    1. AOnly paint refresh
    2. BOnly new signage
    3. CAssessment of foundation columns and slabs capacity
    4. DOnly carpet
    💡 Explanation:

    Illegal additions cause collapses in dense urban areas

  8. Q8medium

    Cantilever slab design checks

    1. AOnly paint colour
    2. BOnly tile weight ignored always
    3. COnly wind on roof ignored always
    4. DNegative moment at support and deflection
    💡 Explanation:

    Balconies common failure point if under-designed

  9. Q9hard

    Column splice location preferred at

    1. AMaximum moment mid height always
    2. BFloor level where moment lower
    3. CRandom without analysis
    4. DBelow foundation in soil
    💡 Explanation:

    Constructability and structural logic guide splice placement

  10. Q10Past Paper · PPSC/FPSC/NTSmedium

    Basement waterproofing required when

    1. AGroundwater table may intersect basement
    2. BNever in any city
    3. COnly for roofs
    4. DOnly for windows
    💡 Explanation:

    Karachi Lahore high water table needs tanking or drainage

  11. Q11medium

    Soil test minimum boreholes for high rise typically

    1. AZero holes always
    2. BOne hole anywhere without plan always sufficient always
    3. COnly scrape surface
    4. DSeveral across footprint per geotechnical practice
    💡 Explanation:

    Variability of urban fill requires adequate exploration

  12. Q12Past Paper · PPSC/FPSC/NTSmedium

    Structural peer review required for

    1. ASingle room mud house always exempt typical
    2. BAll dog houses
    3. CMajor complex buildings in many authorities
    4. DAll billboards only
    💡 Explanation:

    Third party check of calculations for tall buildings

  13. Q13easy

    Parapet height and roof access guarded per code to prevent

    1. AOnly bird nesting only without safety
    2. BFalls during maintenance
    3. COnly solar panel colour
    4. DOnly antenna brand
    💡 Explanation:

    Roof safety for equipment servicing

  14. Q14medium

    High rise defined in many bylaws as building exceeding

    1. ASpecific height or storey count like 4 storeys plus
    2. BOnly single storey always
    3. COnly underground only
    4. DOnly temporary tent
    💡 Explanation:

    Additional fire and structural rules apply

  15. Q15Past Paper · PPSC/FPSC/NTSeasy

    Illegal construction risk includes

    1. AAutomatic code compliance
    2. BFree upgrade by government always
    3. CDemolition penalties and safety hazard
    4. DTax refund always
    💡 Explanation:

    Unauthorized extra floors common enforcement issue in cities

  16. Q16Past Paper · PPSC/FPSC/NTSeasy

    Occupancy certificate issued after

    1. AAt excavation start
    2. BBefore foundation
    3. CWithout any inspection
    4. DCompletion inspection meets approved plans
    💡 Explanation:

    OC legalizes building use after code compliance

  17. Q17Past Paper · PPSC/FPSC/NTSeasy

    Municipal building permit requires

    1. AApproved drawings structural calculations NOCs
    2. BOnly verbal description
    3. COnly photo of model
    4. DOnly handshake
    💡 Explanation:

    DAE submits to CDA LDA RDA etc for approval

  18. Q18medium

    Energy provisions in modern codes may address

    1. AOnly structural steel grade
    2. BOnly harbour dredging
    3. COnly railway gauge
    4. DThermal insulation and ventilation
    💡 Explanation:

    Insulation reduces HVAC load in commercial buildings

  19. Q19medium

    Accessibility requirements include

    1. AOnly stairs without lifts always
    2. BOnly narrow doors
    3. CRamps rails and door widths for disabled
    4. DOnly steps at all entrances
    💡 Explanation:

    Universal design increasingly in municipal bylaws

  20. Q20easy

    Parapet wall design must resist

    1. AOnly decorative paint
    2. BWind load and provide fall protection
    3. COnly internal HVAC
    4. DOnly elevator load
    💡 Explanation:

    Height and anchorage per code

  21. Q21hard

    Wind tunnel test used for

    1. ATall iconic buildings with complex shape
    2. BEvery village house mandatory
    3. COnly foundations only
    4. DOnly paint selection
    💡 Explanation:

    When code analytical method inadequate for aerodynamics

  22. Q22hard

    Live load reduction permitted for

    1. ASingle chair only
    2. BAll loads always without limit to zero
    3. CEarthquake load always reduced 90 percent
    4. DLarge influence areas columns support many floors
    💡 Explanation:

    Reduction factors in code with upper limits

  23. Q23Past Paper · PPSC/FPSC/NTSeasy

    Foundation requirements depend on

    1. ASoil bearing capacity and loads
    2. BOnly facade colour
    3. COnly roof brand
    4. DOnly window tint
    💡 Explanation:

    Shallow or deep foundation per geotechnical report

  24. Q24Past Paper · PPSC/FPSC/NTSeasy

    Minimum concrete cover to reinforcement protects against

    1. AOnly paint adhesion
    2. BCorrosion and fire
    3. COnly tile bonding
    4. DOnly acoustic insulation only
    💡 Explanation:

    Cover specified by exposure and fire rating

  25. Q25Past Paper · PPSC/FPSC/NTSmedium

    Reinforcement detailing for seismic zones requires

    1. ANo ties anywhere
    2. BZero cover always
    3. CCloser ties and development lengths
    4. DPlastic bars only
    💡 Explanation:

    Ductile detailing per BCP seismic sections

  26. Q26easy

    Structural requirements in BCP reference

    1. AOnly oral tradition
    2. BOnly vendor brochure
    3. COnly social media
    4. DACI AISC and other adopted standards
    💡 Explanation:

    Pakistan code adapts international material standards

  27. Q27medium

    Occupant load calculated from

    1. AOnly building height
    2. BFloor area and load factor for use
    3. COnly wind speed
    4. DOnly seismic zone only
    💡 Explanation:

    Assembly uses higher load factor than office

  28. Q28Past Paper · PPSC/FPSC/NTSmedium

    Means of egress includes

    1. AExit access exit and exit discharge
    2. BOnly elevator for all occupancies always
    3. COnly window display
    4. DOnly roof garden
    💡 Explanation:

    Safe evacuation path required by fire provisions

  29. Q29medium

    Fire resistance rating means

    1. ATime to paint building
    2. BTime to build foundation
    3. CTime to submit BOQ
    4. DDuration element resists fire under standard test
    💡 Explanation:

    Rating in hours for walls floors columns

  30. Q30Past Paper · PPSC/FPSC/NTSeasy

    Dead load includes

    1. AOnly furniture people
    2. BOnly wind gust
    3. CSelf weight of structure and permanent fixtures
    4. DOnly earthquake force
    💡 Explanation:

    Permanent loads from materials fixed equipment

  31. Q31Past Paper · PPSC/FPSC/NTSeasy

    Live load on residential floor per BCP order of

    1. A2 kN/m² or as specified in code
    2. B50 kN/m² always
    3. CZero live load allowed
    4. D200 kN/m²
    💡 Explanation:

    Occupancy categories define imposed loads

  32. Q32Past Paper · PPSC/FPSC/NTSmedium

    Basic wind speed in BCP selected using

    1. AOnly random choice
    2. BOnly historical earthquake
    3. CWind map and importance of structure
    4. DOnly soil colour
    💡 Explanation:

    Wind load design per hourly mean recurrence interval

  33. Q33Past Paper · PPSC/FPSC/NTSmedium

    Seismic zone 4 in Pakistan BCP applies to areas like

    1. AEntire country uniformly zone 4
    2. BParts of KPK and Kashmir high hazard
    3. CNo zone 4 exists
    4. DOnly Karachi harbour only
    💡 Explanation:

    Zone 4 highest mapped seismicity in BCP maps

  34. Q34Past Paper · PPSC/FPSC/NTSeasy

    Pakistan Building Code BCP SP 2007 covers

    1. AOnly railway signalling
    2. BOnly harbour dredging
    3. COnly airport ILS only
    4. DStructural fire and general building requirements
    💡 Explanation:

    BCP adopted for engineered construction nationwide

  35. Q35Past Paper · PPSC/FPSC/NTSeasy

    National Building Code NBC context in Pakistan often refers to

    1. AOnly foreign code without adoption
    2. BOnly railway manual
    3. CBCP SP 2007 and municipal bylaws
    4. DOnly airport annex only
    💡 Explanation:

    Local authorities enforce BCP plus city regulations

  36. Q36Past Paper · PPSC/FPSC/NTSeasy

    Zoning in municipal bylaws controls

    1. AOnly interior paint colour
    2. BOnly staff uniform
    3. COnly vehicle tyre size
    4. DLand use density and building type
    💡 Explanation:

    Residential commercial industrial zones in master plans

  37. Q37Past Paper · PPSC/FPSC/NTSeasy

    Setback from plot boundary required for

    1. ALight ventilation and fire access
    2. BOnly decoration
    3. COnly advertising only
    4. DOnly parking ticket
    💡 Explanation:

    Front side rear setbacks in Lahore Karachi Islamabad bylaws

  38. Q38Past Paper · PPSC/FPSC/NTSmedium

    Building height limit in cities governed by

    1. AOnly owner preference unlimited always
    2. BZoning FAR and aviation restrictions
    3. COnly contractor wish
    4. DOnly random dice
    💡 Explanation:

    Height controlled near airports and for infrastructure capacity

  39. Q39Past Paper · PPSC/FPSC/NTSmedium

    FAR floor area ratio equals

    1. APlot width only
    2. BBuilding colour depth
    3. CWind speed ratio
    4. DTotal floor area divided by plot area
    💡 Explanation:

    FAR controls density in urban planning

  40. Q40easy

    FSI same concept as FAR means

    1. AFloor space index limiting built area
    2. BFoundation soil index
    3. CFire safety index only
    4. DFuel storage index
    💡 Explanation:

    Used interchangeably with FAR in planning documents

  41. Q41medium

    Wind load increases with

    1. AUnderground basement depth only
    2. BBuilding height and exposure category
    3. COnly seismic zone only without height
    4. DOnly paint thickness
    💡 Explanation:

    Tall buildings face higher design wind pressures

  42. Q42medium

    Importance factor for hospital in seismic design is

    1. ALower than all others always
    2. BZero always
    3. CHigher than ordinary storage building
    4. DSame as temporary tent always
    💡 Explanation:

    Critical facilities designed for enhanced safety

  43. Q43Past Paper · PPSC/FPSC/NTSmedium

    Fire compartmentation purpose is

    1. AIncrease fire spread
    2. BRemove all exits
    3. CBlock ventilation always completely
    4. DLimit fire spread within building
    💡 Explanation:

    Fire walls and doors contain smoke and flame

  44. Q44medium

    Sprinkler system requirement depends on

    1. AOccupancy height and area thresholds
    2. BOnly owner hobby
    3. COnly exterior paint
    4. DOnly carpet pattern
    💡 Explanation:

    High rise and assembly occupancies often require sprinklers

  45. Q45easy

    Stair width determined by

    1. AOnly aesthetic choice
    2. BOnly seismic zone alone
    3. COccupant load and egress capacity
    4. DOnly wind direction
    💡 Explanation:

    Exit capacity code ensures timely evacuation

  46. Q46easy

    Handrail height on stairs approximately

    1. A200 mm
    2. B900 to 1050 mm per codes
    3. C2 m always
    4. DZero mm
    💡 Explanation:

    Guards prevent falls on stairs and balconies

  47. Q47easy

    Balcony guard height requirement protects

    1. AAgainst falling from elevated floor
    2. BOnly rain ingress
    3. COnly wind uplift on tiles only
    4. DOnly solar gain
    💡 Explanation:

    Minimum height and non-climbable openings

  48. Q48Past Paper · PPSC/FPSC/NTSmedium

    Lateral force resisting system must provide

    1. AOnly decorative function
    2. BComplete load path to foundation
    3. COnly thermal insulation
    4. DOnly acoustic absorption only
    💡 Explanation:

    Diaphragms collectors and foundations complete chain

  49. Q49medium

    Expansion joint spacing in long building reduces

    1. ASeismic demand to zero always
    2. BNeed for any steel
    3. CTemperature and shrinkage cracking
    4. DNeed for foundations
    💡 Explanation:

    Joint spacing depends on material and exposure

  50. Q50easy

    Concrete grade for structural members in Pakistan commonly minimum

    1. AAlways M5 regardless
    2. BZero strength mud always
    3. COnly aggregate without cement
    4. DAs specified in BCP ACI for exposure
    💡 Explanation:

    Higher grades for higher stress and durability

  51. Q51medium

    Development length of rebar ensures

    1. AOnly visual alignment
    2. BAdequate bond with concrete
    3. COnly colour match
    4. DOnly magnetic effect
    💡 Explanation:

    Without enough length bar pulls out under load

  52. Q52Past Paper · PPSC/FPSC/NTShard

    Lap splice not permitted in plastic hinge region per seismic detailing because

    1. ALap always stronger everywhere without limit
    2. BCode prefers random placement
    3. CLap reduces cost always primary reason
    4. DBond may degrade under cyclic loading
    💡 Explanation:

    Mechanical couplers or offset splices used instead

  53. Q53medium

    Shear wall minimum reinforcement includes

    1. AOnly paint mesh
    2. BZero reinforcement allowed
    3. CHorizontal and vertical bars
    4. DOnly glass fibre without steel
    💡 Explanation:

    Walls need boundary confinement in seismic zones

  54. Q54hard

    Soft storey prohibition addressed by

    1. AStiffness checks and stronger lower storey
    2. BRemoving all columns ground floor
    3. CInfinite openings without bracing
    4. DUsing only glass walls ground floor
    💡 Explanation:

    Irregularity provisions in BCP seismic chapter

  55. Q55Past Paper · PPSC/FPSC/NTSmedium

    Soil bearing pressure verified by

    1. AGuess without test always
    2. BOnly wind tunnel
    3. COnly paint test
    4. DPlate load or SPT correlation before design
    💡 Explanation:

    Geotechnical report mandatory for high-rise permits

  56. Q56easy

    Raft foundation used when

    1. AOnly on rock cliff always
    2. BSoil capacity low or loads heavy uniform
    3. COnly on single column only always
    4. DNever in Pakistan
    💡 Explanation:

    Mat spreads load reducing bearing pressure

  57. Q57Past Paper · PPSC/FPSC/NTSeasy

    Pile foundation needed when

    1. AAlways cheaper than all footings always without exception
    2. BOnly for fences
    3. CWeak upper soil over competent stratum
    4. DOnly for paint booths
    💡 Explanation:

    End bearing or friction piles carry load down

  58. Q58easy

    Fire exit door must swing

    1. AIn direction of egress travel generally
    2. BAlways inward into room during escape always wrong way
    3. CNever open
    4. DOnly slide horizontally always without exception
    💡 Explanation:

    Outward swing aids evacuation except specific cases

  59. Q59medium

    Travel distance to exit limited to

    1. AUnlimited any distance
    2. BProtect occupants before untenable conditions
    3. COnly 1 metre always everywhere
    4. DOnly 10 km
    💡 Explanation:

    Maximum travel per occupancy and sprinkler status

  60. Q60hard

    Dead load reduction factor not applied to

    1. AAll loads always reduced 50 percent
    2. BNothing ever uses factors
    3. CPermanent structural self weight in stability
    4. DOnly live load only ever considered
    💡 Explanation:

    Load combinations per BCP for strength and serviceability