- Q1Past Paper · PPSC/FPSC/NTSmedium
Safety tagging on isolated NTDC circuits uses
💡 Explanation:Tag system communicates status to all personnel.
- Q2Past Paper · PPSC/FPSC/NTSeasy
Grid frequency in Pakistan is nominally
💡 Explanation:Synchronized area operates at 50 Hz like much of Asia/Europe.
- Q3Past Paper · PPSC/FPSC/NTSeasy
Working near exposed busbars in substation requires
💡 Explanation:EHV environments demand rigorous PPE and procedure.
- Q4Past Paper · PPSC/FPSC/NTSeasy
Consumer earthing inspection under distribution safety rules checks
💡 Explanation:DISCOs enforce safe installation practices at service.
- Q5medium
Reporting of major grid disturbances to regulator supports
💡 Explanation:Performance standards drive accountability.
- Q6medium
Live-line maintenance on transmission requires
💡 Explanation:Hot-line work follows strict NTDC safety manuals.
- Q7Past Paper · PPSC/FPSC/NTShard
Neutral earthing in transmission is often through
💡 Explanation:Grounding practice limits fault current and overvoltages.
- Q8Past Paper · PPSC/FPSC/NTSmedium
Distributed generator connecting to grid must meet NEPRA/NTDC requirements for
💡 Explanation:Interconnection standards protect grid and personnel.
- Q9hard
Incident energy study for NTDC/DISCO switchgear supports
💡 Explanation:Arc flash hazard analysis protects maintenance staff.
- Q10Past Paper · PPSC/FPSC/NTShard
Earthing of NTDC substation structures and equipment follows
💡 Explanation:IEEE 80 / IEC practices model grid resistance and gradients.
- Q11Past Paper · PPSC/FPSC/NTSmedium
Protection coordination on NTDC grid ensures
💡 Explanation:Time and distance grading maintain stability and supply.
- Q12Past Paper · PPSC/FPSC/NTSmedium
Authorization to work on NTDC substation equipment requires
💡 Explanation:Systematic LOTO prevents accidental re-energization.
- Q13Past Paper · PPSC/FPSC/NTSeasy
Safety clearance from live overhead lines for workers is governed by
💡 Explanation:Approach distances depend on voltage level.
- Q14Past Paper · PPSC/FPSC/NTSmedium
Permissible voltage variation at consumer terminals in many standards is approximately
💡 Explanation:Voltage quality clauses protect equipment and service quality.
- Q15Past Paper · PPSC/FPSC/NTSmedium
Grid Code issued under NEPRA framework defines
💡 Explanation:Grid code sets voltage, fault ride-through, protection and metering rules.
- Q16Past Paper · PPSC/FPSC/NTSeasy
NTDC operates
💡 Explanation:National Transmission and Despatch Company manages EHV network.
- Q17Past Paper · PPSC/FPSC/NTSeasy
NEPRA in Pakistan regulates
💡 Explanation:National Electric Power Regulatory Authority oversees electricity market.
- Q18Past Paper · PPSC/FPSC/NTSmedium
Periodic inspection of RCD includes
💡 Explanation:Test equipment verifies trip within specified milliseconds.
- Q19hard
Fire protection RCDs may be rated
💡 Explanation:Higher threshold prevents nuisance trips on leakage capacitance.
- Q20Past Paper · PPSC/FPSC/NTSeasy
RCD rated residual operating current IΔn is
💡 Explanation:IΔn (e.g., 30 mA, 100 mA, 300 mA) sets sensitivity class.
- Q21Past Paper · PPSC/FPSC/NTSmedium
In TT installations RCD is often mandatory because
💡 Explanation:RCD clears faults at low leakage current without low Zs.
- Q22Past Paper · PPSC/FPSC/NTSmedium
ELCB/RCD must be connected such that
💡 Explanation:Differential sensing requires all current-carrying wires through core.
- Q23hard
Type AC RCD is suitable for
💡 Explanation:Type A/B/AEV address pulsating DC and HF applications.
- Q24Past Paper · PPSC/FPSC/NTShard
30 mA RCD may not detect
💡 Explanation:RCD needs earth leakage path; MCB clears line faults.
- Q25Past Paper · PPSC/FPSC/NTSmedium
IEC 60439 / modern switchgear may use RCBO which combines
💡 Explanation:RCBO protects cable and persons on same pole.
- Q26easy
RCD test button creates
💡 Explanation:Monthly user test confirms trip mechanism operates.
- Q27hard
Selective (time-graded) RCD coordination uses
💡 Explanation:Discrimination limits outage to faulted circuit.
- Q28Past Paper · PPSC/FPSC/NTSmedium
RCD nuisance tripping may be caused by
💡 Explanation:Equipment capacitive leakage can approach 30 mA threshold.
- Q29medium
Voltage-operated ELCB is largely superseded because
💡 Explanation:Current-balance RCD is preferred in modern installations.
- Q30Past Paper · PPSC/FPSC/NTSmedium
RCD does not replace
💡 Explanation:RCD handles leakage; MCB handles overcurrent.
- Q31Past Paper · PPSC/FPSC/NTSeasy
Standard residential RCD sensitivity is often
💡 Explanation:30 mA limits shock duration/current for wet locations.
- Q32Past Paper · PPSC/FPSC/NTSeasy
Residual Current Device (RCD) operates when
💡 Explanation:Differential current through toroidal core trips device.
- Q33Past Paper · PPSC/FPSC/NTSeasy
Earth Leakage Circuit Breaker (ELCB) detects
💡 Explanation:Core-balance or voltage-operated types sense earth leakage.
- Q34medium
Minimum size of main earthing conductor in many codes depends on
💡 Explanation:Cross-section must carry prospective earth fault current.
- Q35Past Paper · PPSC/FPSC/NTSmedium
Lightning protection earth should be
💡 Explanation:Coordinated bonding avoids dangerous potential differences.
- Q36Past Paper · PPSC/FPSC/NTShard
Earth mat in substations is provided to
💡 Explanation:Buried or surface mesh equalizes potential under EHV equipment.
- Q37medium
Chemical earthing (maintenance-free) uses
💡 Explanation:Hygroscopic compounds keep moisture around electrode.
- Q38Past Paper · PPSC/FPSC/NTShard
Step potential hazard near earth electrode during fault is
💡 Explanation:Gradient in earth potential can shock personnel nearby.
- Q39hard
TN-C-S (PME) combines neutral and earth on supply side with
💡 Explanation:PEN becomes separate N and PE at customer intake.
- Q40Past Paper · PPSC/FPSC/NTShard
TT system earthing has
💡 Explanation:TT relies on local R_A and RCD due to higher loop impedance.
- Q41Past Paper · PPSC/FPSC/NTSmedium
Separate protective earth (PE) and neutral (N) must not be
💡 Explanation:TN-S keeps N and PE separate to avoid neutral current on earth paths.
- Q42medium
Ring earth electrode around building in IEC practice provides
💡 Explanation:Ring in trench with electrodes improves contact area.
- Q43Past Paper · PPSC/FPSC/NTSmedium
Measurement of earth resistance commonly uses
💡 Explanation:Auxiliary electrode placement determines measured earth R.
- Q44Past Paper · PPSC/FPSC/NTSmedium
Soil resistivity affects earth electrode resistance such that
💡 Explanation:R_e ∝ ρ; measurement drives electrode design.
- Q45Past Paper · PPSC/FPSC/NTSeasy
Earth continuity conductor (ECC) ensures
💡 Explanation:ECC links exposed conductive parts to main earth.
- Q46Past Paper · PPSC/FPSC/NTSmedium
IS/IEC practice requires main equipotential bonding to connect
💡 Explanation:Bonding limits potential differences during earth faults.
- Q47Past Paper · PPSC/FPSC/NTSeasy
Plate earth electrode uses
💡 Explanation:Large plate area contacts soil to reduce resistance.
- Q48Past Paper · PPSC/FPSC/NTSeasy
Pipe earth electrode is commonly made of
💡 Explanation:Metal pipe in moist soil forms electrode; backfill with salt/coal may lower R.
- Q49Past Paper · PPSC/FPSC/NTSeasy
Earth electrode resistance should generally be
💡 Explanation:Lower resistance improves fault clearance and touch voltage control.
- Q50Past Paper · PPSC/FPSC/NTSeasy
Purpose of electrical earthing in installations is primarily to
💡 Explanation:Earthing enables protective devices to operate and reduces shock risk.